Data

PollyXT

Automatically uploaded on 2016-01-22 14:15:03.

Start time Jan. 21, 2016, 6 a.m.
Stop time Jan. 21, 2016, noon
Duration 6 hours
Instrument PollyXT Raman lidar
Previous Next

Related graphs

Measurement graph

Graph 1: Range-corrected signal@355nm - 2016_01_21_Thu_NOA_06_00_01-355.png

Measurement graph

Graph 2: Range-corrected signal@532nm - 2016_01_21_Thu_NOA_06_00_01-532.png

Measurement graph

Graph 3: Range-corrected signal@1064nm - 2016_01_21_Thu_NOA_06_00_01-1064.png

Measurement graph

Graph 4: Volume depolarization ratio - 2016_01_21_Thu_NOA_06_00_01-depol.png

Logs & Measurements

PollyXT Raman lidar logs
  • Insulation removed - Thermostats and beam adjustment (Jan 21st, 2016)
Parallel measurements
ACTRIS logo

The campaign is organized and funded through the ACTRIS, the European Research Infrastructure for the observation of Aerosol, Clouds, and Trace gases.