Data

PollyXT

Automatically uploaded on 2016-02-25 03:15:04.

Start time Feb. 24, 2016, 12:47 p.m.
Stop time Feb. 24, 2016, 6:47 p.m.
Duration 6 hours
Instrument PollyXT Raman lidar
Previous Next

Related graphs

Measurement graph

Graph 1: Range-corrected signal@355nm - 2016_02_24_Wed_NOA_12_47_58-355.png

Measurement graph

Graph 2: Range-corrected signal@532nm - 2016_02_24_Wed_NOA_12_47_58-532.png

Measurement graph

Graph 3: Range-corrected signal@1064nm - 2016_02_24_Wed_NOA_12_47_58-1064.png

Measurement graph

Graph 4: Volume depolarization ratio - 2016_02_24_Wed_NOA_12_47_58-depol.png

Logs & Measurements

PollyXT Raman lidar logs
  • NARLA uninstalled (Feb 24th, 2016)
Parallel measurements
ACTRIS logo

The campaign is organized and funded through the ACTRIS, the European Research Infrastructure for the observation of Aerosol, Clouds, and Trace gases.